|
> Home > Scheduling Optimizer Procedures (How Do I ...?) > Synchronize Period Numbers Synchronize SASIxp and Scheduling Optimizer Period NumbersMaster Schedule Lists and Grids, Unscheduled Period Summaries and Free Resource Lists and Grids all display period numbers. By default, the Scheduling Optimizer uses period labels 01, 02, 03, etc. If you have set the "Periods: Begin" field in the School atom/General tab to a number other than 01 (most commonly this option is used to label the first period of the day as 00), the Optimizer’s default period labels will not match the period labels displayed in SASIxp. This procedure adjusts the period labels displayed in Scheduling Optimizer reports to have the same meanings as those displayed in SASIxp.
ProcedureReview the School atom/General tab to determine the starting period number defined for the school day. If it is not 01, follow these steps.
Notes
|
|
Scheduling Optimizer for SASIxp Scheduling from Tabby Software Copyright © 2001 - 2006 by Stephen D. Cohen. All rights reserved. Contact us at info@tabbysoft.com SASIxp is a trademark of Pearson School Systems HOME | FEEDBACK | Q&A | FAQ | WHAT'S NEW? | CONTACT US FEATURES | HOW DO I ...? | REPORTS | SUPPORT | DOWNLOADS | NEWSLETTERS |