Tabby Software

Scheduling Optimizer for SASIxp Scheduling

Features How do I..? Reports Support Downloads Newsletters

> Home > Scheduling Optimizer Procedures (How Do I ...?) > Synchronize Period Numbers

Synchronize SASIxp and Scheduling Optimizer Period Numbers

Master Schedule Lists and Grids, Unscheduled Period Summaries and Free Resource Lists and Grids all display period numbers. By default, the Scheduling Optimizer uses period labels 01, 02, 03, etc. If you have set the "Periods: Begin" field in the School atom/General tab to a number other than 01 (most commonly this option is used to label the first period of the day as 00), the Optimizer’s default period labels will not match the period labels displayed in SASIxp. This procedure adjusts the period labels displayed in Scheduling Optimizer reports to have the same meanings as those displayed in SASIxp.

 

Procedure

Review the School atom/General tab to determine the starting period number defined for the school day. If it is not 01, follow these steps.

 

Note the starting period number.
The following School atom screen sample shows a school day that starts with period 00.

 

Use the Global Scheduling Specification atom to enter a 2-digit number in the “Pd Code” field for each period sequence position.
If present, these “Pd Code” entries define the period labels the Scheduling Optimizer will display for each period of the day beginning with the first one. The following illustrates the definition corresponding to the period range defined in the above School atom.

Notes

If the School atom/General tab specifies that period numbers in SASIxp start with 01, the default period labels displayed by the Scheduling Optimizer will correctly match the SASIxp periods. In this case, it is not necessary to provide period labels in the Global Scheduling Specification atom.
The Scheduling Optimizer interprets the period codes entered in the Global Scheduling Specification atom in the same way as Schedule Pro. If you use Schedule Pro and the periods are displaying correctly, they will also display correctly in Scheduling Optimizer reports.

 

Back to Top

Scheduling Optimizer for SASIxp Scheduling from Tabby Software

Copyright © 2001 - 2006 by Stephen D. Cohen. All rights reserved.

Contact us at info@tabbysoft.com

SASIxp is a trademark of Pearson School Systems

HOME | FEEDBACK | Q&A | FAQ | WHAT'S NEW? | CONTACT US

FEATURES | HOW DO I ...? | REPORTS | SUPPORT | DOWNLOADS | NEWSLETTERS